SOUTH CANYON RV PARK WASTEWATER & WATER SYSTEM DESIGN
PROJECT TYPEs
Wastewater Collection & Treatment
Potable Water & Pipeline
CLIENT
Summit Creek Development
LOCATION
Twin Falls, ID
project description
WCG provided comprehensive services for the design and implementation of the South Canyon RV Park's water supply and wastewater treatment system. The water supply system included design and construction of a potable water well and a well house, which included water storage, booster pumps, pressure tank, control system, and a distribution network.
The design of the wastewater system included a lift station, flow equalization, fixed-film wastewater treatment process, and two evaporation ponds. Construction documents, construction support, operation and maintenance manuals, preliminary engineering reports, and record drawing certifications were in included for both the water and wastewater systems.
key services list:
Supply Well Design & Construction Support
Water Storage Design
Booster Pump System Design
Distribution System Hydraulic Modeling & Analysis
Sewage Lift Station Design
Municipal Wastewater Treatment System
Nutrient-Pathogen Study
Local, State, and Federal Regulatory Compliance